Sink & island rough-in
Moving a sink to an island takes careful drain and vent planning. We design it to pass inspection.
- Island venting solutions
- Drain relocation
- New supply runs
Sink and island moves, dishwashers, disposals, fridge lines, pot fillers, and gas range hookups. We plan the plumbing around your layout, then come back to set the finish once the counters are in.
Water, drains, venting, and gas, all from the same licensed plumber.
Moving a sink to an island takes careful drain and vent planning. We design it to pass inspection.
New or replacement dishwashers with the right supply, drain loop, and shutoff.
Installed, replaced, and wired into the sink drain properly.
Clean water lines to fridges, ice makers, and filtered water taps.
Pot fillers, bar sinks, and filtered taps, plumbed in before the backsplash goes up.
Switching to gas, or moving the range? We run and test the gas line to code.
Kitchen plumbing happens in stages. Here's where we fit in.
We walk the layout with you so the plumbing plan matches the cabinet plan.
Supply, drain, vent, and gas lines run and inspected before walls and floors close.
Sink, faucet, disposal, and dishwasher set once counters are in.
Every connection run and leak-checked, gas pressure tested, and you're walked through the shutoffs.
Have a different one? Call (360) 488-8553.
Usually, yes. Islands need a venting plan, and we'll pick the code-approved method that suits your layout.
Yes. We install appliances you supply and make sure the hookups are done right.
Yes. We're licensed for gas and can run new lines, move existing ones, and connect ranges and cooktops.
Yes. We regularly work alongside general contractors and cabinet installers on kitchen remodels.
Rough-in is usually one to two days, and finish work about a day once counters are in. We schedule around the rest of your project.
Tell us about the remodel. We'll set up a walkthrough and get you a clear quote.