24/7 emergency line open Snohomish County · Licensed · Bonded · Insured · BBB Accredited (360) 488-8553 →
Shower valve trim-out
Service / 10 · Bathroom Plumbing & Remodels

Bathroom plumbing,
rough-in to finish. Big Four Plumbing — bathroom remodel plumbing in Granite Falls and Snohomish County, WA.

Full bath remodels, shower conversions, and fixture upgrades. We work with your contractor or directly with you: clean rough-ins that pass inspection, and careful finish work on the fixtures you'll use every day.

  • Contractors Builder partnerships welcome
  • Permits Pulled & inspected
  • Finish Careful trim-out work
100% Permitted & inspected
1 Licensed plumber on every job
Same day Quotes on most requests
5.0★ Google rating
What we do / 01

Everything behind the tile
and everything on it.

From moving a drain to setting the last trim plate.

01

Full bathroom rough-in

New supply, drain, and vent layouts for gut remodels and additions, ready for inspection.

  • Supply & DWV rough-in
  • Layout changes
  • Inspection ready
02

Tub-to-shower conversions

Swap an old tub for a walk-in shower, with the valve and drain moved where they need to be.

  • Drain relocation
  • Pressure-balance valves
  • Curbless-ready drains
03

Shower valves & trim

New mixing valves, thermostatic systems, body sprays, and handheld setups.

  • Thermostatic valves
  • Rain heads & handhelds
  • Trim kit installs
04

Vanities & sinks

Single to double vanity conversions, vessel sinks, and wall-mount faucets.

  • Double-vanity plumbing
  • Vessel & undermount sinks
  • New shutoffs & traps
05

Toilet relocation

Moving the toilet usually means moving the drain and vent too. We plan it so it passes inspection.

  • Drain & vent moves
  • Flange set to finished floor
  • Subfloor coordination
06

Fixture upgrades

Not a full remodel? New fixtures alone can change how a bathroom feels.

  • Faucets & showerheads
  • Toilets & bidet seats
  • Tub fillers
How it goes / 02

How a bathroom remodel
goes with us.

Plumbing is the part of a remodel you can't easily redo. We take it step by step.

01

Walkthrough & layout

We look at what's there, what you want, and what the drains and vents will allow.

02

Rough-in & inspection

Supply, drain, and vent installed, pressure tested, and inspected before walls close.

03

Work with the trades

We coordinate with your contractor, tile setter, and cabinet installer so nothing gets missed.

04

Finish & test

Fixtures set, trim installed, everything run and leak-checked before we're done.

FAQ / 03

Bathrooms questions.

Have a different one? Call (360) 488-8553.

Do you work with general contractors?

Yes, regularly. We're happy to be your plumber on a contractor-run remodel, or to work directly with homeowners.

Can you move my shower or toilet?

Usually, yes. It depends on joist direction, drain slope, and venting. We'll tell you what's possible at the walkthrough.

Do you pull the permits?

Yes. We pull the plumbing permit and schedule the inspections.

Do I buy the fixtures or do you?

Either works. Many clients pick their own fixtures. We'll confirm valves and rough-in parts match before rough-in day.

How long does the plumbing take on a bathroom remodel?

Rough-in is often one to two days, with finish work after tile and cabinets are in. The overall timeline depends on the other trades.

Free quote / 04

Plan your bathroom plumbing.

Tell us about the project. We'll set up a walkthrough and get you a clear quote.

Bathroom project quote Avg. response · same day

By submitting you agree we may contact you about your request. Formspree securely processes this form. We never sell your information.

Call now